What else is being added in this pipeline project?

- The Eagle Mountain (Coquitlam) compressor station will be expanded to 40,000BHP (brake horsepower). It will be powered with a new BC Hydro power line to be installed across Eagle Mountain Public Park.

- a new 15,000BHP (brake horsepower) compressor in Squamish. It too will be electric-powered.

- a new gas-powered Port Mellon compressor scaled at 6,100BHP. Fortis says these are needed because of the expected large drawdown by the Woodfibre plant.